2026-07-16
BB-202603878 -- Space is being built out to be used as an out source kitchen for the school while the school Demos the cafeteria building.
All equipment will be newly installed.
Install one(1) Trane 12.5 Ton Split System, All new square duct work, take offs, flex and grilles. Return Duct will be spiral.
Set two(2) Captive Air Make up Units for kitchen hood and all corresponding duct work.
Install two(2) Captive Air Exhaust fans on the roof. Roofer to make penetrations(not us) and connect to double wall duct work.
Install the Captive Air Kitchen Hood.
Install the kitchen gas line, regulators, and gas whips. From the meter as 2" header to all corresponding devices(kitchen equipment, Make up air units).
2026-07-15
THE LOVETT SCHOOL - TEMPORARY KITCHEN -- MODIFICATION TO FIRE ALARM SYSTEM FOR RENOVATION.
2026-07-15
The Lovett High School- Upper - 4075 PACES FERRY NW RD
2026-07-14
The Lovett Middle School - 4075 PACES FERRY NW RD
2026-07-14
The Lovett School High - 4075 PACES FERRY NW RD
2026-07-14
Smith Natatorium - 4075 PACES FERRY NW RD
2026-07-14
Scout Building - 4075 PACES FERRY NW RD
2026-07-14
Lovett School- Physical Plant - 4075 PACES FERRY NW RD
2026-07-09
Upper School Zenith Construction Project -- Remove four Trane Fan coil units, and install new Trane FCUs.
Main trunk line duct to remain.
New flex duct, supply diffusers, return grilles.