2026-08-24
Installation of concrete piles, pile cap, and concrete pedestal to anchor the relocation of "Kinetic Ring". "Kinetic Ring" was previously installed at the intersection of W Kennedy Blvd and State Road 60.
"Kinetic Ring" will be installed near the existing trail through the park, near the existing ADA beach access.
See site plan prepared by the City of Tampa Parks & Recreation Department and structural engineering plans prepared by Belt Engineering.